Corporate Crystal Chandeliers

We are often asked to design Chandeliers and Lighting installations for corporate clients. These projects often require larger compositions and therefore require considerably more design and engineering work. We are happy to design bespoke works for large or small features that enhance our client's environments with uniquely designed solutions for a variety of interior spaces.

We were approached by the World Duty Free Group to create a large crystal chandelier for the new Duty free area in Heathrow Terminal 5.

1. Corporate Crystal Chandeliers

'For Heathrow, we first had to create a working prototype that illustrated our lighting scheme with a careful selection of crystal.

Contact us...
2. Corporate Crystal Chandeliers

This detail shows how the prototype translated through to the actual installation.

Contact us...
3. Corporate Crystal Chandeliers

Once signed off we went through a rigorous design and build process that resulted in an 10m x 2.5 m approved design that utilised 10 polished stainless steel sheets, two lighting schemes and over 5000 numbered crystal strands or chains. Shown here is the first stage of installation - fixing of our structure to the Heathrow structure.

.Contact us...
4. Corporate Crystal Chandeliers

Close Up on the crystal during installation.

Contact us...
5. Corporate Crystal Chandeliers

Here we see the 10m long chandelier a central fixture to main Duty free area at Terminal 5, London Heathrow

Contact us...
6. Corporate Crystal Chandeliers

Contact us...
7. Corporate Crystal Chandeliers

CCC Ltd designed this smaller version with WDFG and installed it into the new Collection store the first week of 2016.

Contact us...
8. Corporate Crystal Chandeliers

Although composed of mainly acrylic rather than crystal these images show the third item we have produced for Heathrow Terminal 5. This was a very difficult installation as the whole piece had to be installed in an area that was active during the daylight hours - Due to rigorous health and safety laws we had to rely on help from other contractors to work around the existing store furniture.

Contact us...
Page created in 0.268491 seconds.